MCCS Henderson Hall Pool
![MCCS Henderson Hall Pool.jpg](https://static.wixstatic.com/media/0c0cb4_428a73464b4741ec99c7b1b520434e56~mv2.jpg/v1/fill/w_980,h_735,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/MCCS%20Henderson%20Hall%20Pool.jpg)
MCCS Henderson Hall Pool.jpg
![MCCS Henderson Hall Pool](https://static.wixstatic.com/media/0c0cb4_7c6d467042e746f89dd642361497e22c~mv2.jpg/v1/fill/w_870,h_400,al_c,q_80,enc_avif,quality_auto/MCCS%20Henderson%20Hall%20Pool.jpg)
MCCS Henderson Hall Pool
![MCCS Henderson Hall Pool](https://static.wixstatic.com/media/0c0cb4_58d8d237756e40e19eb907a9a729b7bf~mv2.jpg/v1/fill/w_980,h_561,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/MCCS%20Henderson%20Hall%20Pool.jpg)
MCCS Henderson Hall Pool
HENDERSON HALL - ZEMBIEC POOL
Address: Arlington, VA
Client/Owner: US Department of the Navy
In a Design/Build partnership with Allen & Shariff Construction, Symmetry First designed renovations to the existing pool house and the addition of a Collapsible Air Dome over the pool. The new construction provides the Marines with a swimming / training facility that can be utilized year‐round.
Consultants:
Adtek Engineers, Inc. ‐ Civil and Structural Engineering
SRBR Engineers, Inc. ‐ Mechanical/Electrical/Plumbing Engineering
Hughes Associates, Inc. ‐ Fire Protection Engineering
Actual Construction Cost: $1,684,418
Construction was completed in 2009.