HENDERSON HALL - ZEMBIEC POOL
Address: Arlington, VA
Client/Owner: US Department of the Navy
In a Design/Build partnership with Allen & Shariff Construction, Symmetry First designed renovations to the existing pool house and the addition of a Collapsible Air Dome over the pool. The new construction provides the Marines with a swimming / training facility that can be utilized year‐round.
Consultants:
Adtek Engineers, Inc. ‐ Civil and Structural Engineering
SRBR Engineers, Inc. ‐ Mechanical/Electrical/Plumbing Engineering
Hughes Associates, Inc. ‐ Fire Protection Engineering
Actual Construction Cost: $1,684,418
Construction was completed in 2009.